An official website of the United States government
Here's how you know
A .mil website belongs to an official U.S. Department of Defense organization in the United States.
A lock (lock ) or https:// means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.

This Week in Seabee History (Week of January 7 ? January 13)

Jan. 8, 2018 | By ggranger
Consolidated by Dr. Frank A. Blazich Jr., Historian, Naval History and Heritage Command [caption id="attachment_11312" align="alignnone" width="618"]
11312
VIRIN: 160111-N-ZY182-1312
Seabee sign on Bougainville Island, part of the Solomon Islands archipelago, Jan. 2, 1944. (Photo courtesy of the U.S. Navy Seabee Museum) Beginning in January 1991: U.S. Marines began to move north in preparation for the expected ground assault on the Iraqis. In support of this, the Seabees began to concentrate on building and maintaining roads to serve as the main supply routes throughout northern Saudi Arabia. After months of constructing millions of square feet of aircraft aprons, camps for tens of thousands of Marines, and hundreds of acres of ammunition and supply points, the Seabees prepared to support the ground assault into Kuwait. NMCB 5 moved half its strength to Al Kabrit, 30 miles from the Kuwaiti border, and began construction of a Naval Construction Force Logistics Support Base from which the Seabees could provide the First Marine Expeditionary Force the construction support needed during the upcoming assault into Kuwait. The top construction priorities during this period were water, roads, and facilities for the Marine division assembly areas. Water was obtained by exploiting already-existing wells, and the Seabees built galley facilities for the 30,000 Marines of the 1st and 2nd Marine Divisions. A 40,000 man capacity enemy prisoner of war camp was also built. [caption id="attachment_15733" align="alignnone" width="618"]
15733
VIRIN: 180108-N-ZY182-5733
Petty Officer Second Class Michael Cowart smooths concrete during construction of a Marine camp in northern Saudi Arabia. Cowart is a member of the Naval Mobile Construction Battalion Five operating during Operation Desert Storm in February 1991. Photographed by CWO2 Ed Bailey. (NHHC Photograph Collection, Navy Subject Files, Seabees) The most formidable task facing the Seabees was the road network required by General Schwarzkopf's "End Run" attack strategy. Spanning more than 30 miles of desert from Al Mishab to Al-Kabrit, the "End Run" strategy ultimately required more than 200 miles of roads west and north of the Kuwaiti border. Because of the need to deceive the Iraqis, much of the construction necessary had to be done at the last minute. Working in the wettest weather seen in Saudi Arabia in years, Seabees completed the necessary construction in approximately two weeks. Thousands of trucks moved million of gallons of water and fuel, and tons of supplies, ammunition and spare parts on this road network to support the two Marine divisions making the assault. By the time the assault was launched, Seabees were maintaining approximately 200 miles of roads near the Kuwaiti border. One of these roads was an east-west corridor from Ras Al Mishab through Al Kabrit, continuing past Al Qaraah for a total distance of almost 100 miles. This six-lane road was traversed daily by more than 500 heavy haulers and thousands of tactical vehicles. ----------------- January 7 1946: Last section of 38th NCB inactivates at Yokosuka, Japan; 17th Special NCB inactivated on Leyte, Philippines. 1970: Seabee Team 0410 returned to Construction Battalion Center (CBC), Port Hueneme, California from Vietnam. -----------------
January 8 1943: 64th Naval Construction Battalion (NCB) commissioned at Camp Bradford, Norfolk, Virginia. 1946: 47th Naval Construction Regiment (NCR) inactivated; 4th Special NCB inactivated at Okinawa. 1968: Naval Mobile Construction Battalion (NMCB) 8 s advance party arrived on board at Camp Wilkinson, RVN. 1970: Seabee Team 7102 arrived at Davisville, Rhode Island from Vietnam for reassignment to NMCB 7. 1973: Seabees of NMCB 71 complete construction of a geodesic dome at the new Amundsen-Scott South Pole Station. Over the next few decades, the dome becomes the iconic image of the South Pole station. ----------------- January 9 1969: Seabee Team 0914 completed training at the 31st NCR and deployed to Camp Kinser, Okinawa, on a C-118 aircraft from Naval Air Station (NAS) Point Mugu, California. ----------------- January 10 1942: The first man received at Quonset Point, Rhode Island for the newly formed construction force was Shipfitter 1st Class Robert Thomas Adams, USNR, from Newport, Rhode Island. He arrived on January 10, 1942. Adams was not the first man enlisted, but because of the alphabetical sequence of his name, he appears in the original construction battalion books as the first Seabee. 1943: 68th NCB commissioned at Camp Bradford, Norfolk, Virginia. 1946: 37th Special NCB inactivated at Oahu, Hawaii. 1967: Seabee Team 0510 deployed to the Republic of Vietnam (RVN). ----------------- January 11 1959: The men of Mobile Construction Battalion (MCB) 10 boarded the USNS Daniel Sultan at Guam, Mariana Islands for transfer to their homeport at the Naval Construction Battalion Center (NCBC), Port Hueneme, California. MCB 10 was established on Guam in 1952. This establishment was actually a re-designation of the last active World War II Naval Construction Force unit, the 104th Naval Construction Battalion, under its new mission concept as a mobile land-based construction battalion. Until its recent disestablishment in July 1976, MCB 10 was the only construction battalion in continuous operation since World War II. 1967: Five NMCB 8 personnel were wounded in an enemy mining incident approximately 12 miles south of Chu Lai, RVN on a road leading from Route 1 to the 2/7 Marines Echo Company area. The vehicle involved was well sand-bagged and as a result, the personnel injuries were relatively slight. The two men in the cab of the vehicle were air evacuated to the First Medical Battalion. 1968: NMCB 7 s Detail Alpha Nine returned from Khe Sanh, RVN to Camp Adenir after being relieved by NMCB 53 personnel; Seabee Team 0602 arrived in Saigon, RVN. The team moved by convoy to Phuoc Tuy Province, RVN on January 22, 1968. 1971: NMCB 4 main body departed Okinawa for the continental U.S. (CONUS). 2005: NMCB 40 Seabees arrived in Sri Lanka in response to the December 26, 2004 tsunami that devastated Southeast Asia. Other Seabees from NMCB 7, 30th NCR, and Underwater Construction Team (UCT) 2 arrived within days to Sri Lanka and Thailand to provide disaster relief and survey port facilities. ----------------- January 12 1967: Seabee Team 0807 deployed from Port Hueneme, California to Diem Khanh, RVN. 1968: Steelworker (Fabricator) 3rd Class J.R. Couch, USN, drowned while swimming near Red Beach, Da Nang Bay, RVN. His body was recovered on January 16 by a U.S. Marine Combined Action Platoon near Nam O Point. 1972: Seabee Team 6206 returned to the Construction Battalion Center (CBC), at Gulfport, Mississippi. ----------------- January 13 1968: Equipment Operator (Construction Equipment) 3rd Class Daniel E. Houle, and Equipment Operator (Hauling) 3rd Class Rodney L. Taylor, were wounded by shrapnel from a booby-trapped sand bag while working on Route No. 1, RVN. 1972: Seabee Team 4006 returned from Vietnam deployment.